Skip to content
Lodgcore Hotel Management System

PMS integration

PMS Integration — The Interfaces That Decide the Project

The PMS is only as good as what it can talk to. This guide covers the common interfaces, the questions to ask and the failure paths that matter at 23:00.

Updated 4 November 2026 · Website technical team

Window grid on a hotel tower

What this guide covers

Six decisions, in order.

01

OTA and channels

Availability, rates, restrictions and reservation delivery.

02

Payments

Terminals, gateways and settlement references.

03

Door locks

Key cards, mobile credentials and compatibility.

04

Accounting

Revenue, tax and AR export with a reconciled mapping.

05

Ownership

Who fixes what when a third-party interface fails.

06

Testing

Sandbox, failure cases and regression after upgrades.

How to use this guide

Turn each interface into a line in the project plan with an owner, a test and a fallback. The integration list is a scope document, not a partner page.

If a critical interface is not tested before signing, it is a risk, not a feature.

Common mistakes

Assuming a logo means a connection, testing only the happy path, and leaving ownership vague when a third party fails.

  • Unnamed vendor
  • No sandbox
  • No failure test
  • No log review
  • No fallback

What to read next

Read the channel manager, booking engine and contactless check-in pages for the interface detail.

  • Channel manager
  • Booking engine
  • Contactless check-in
  • Security

How this guide is maintained

The interface list is reviewed when a vendor, a model or an API version changes.

Reference integration plan

A 90-room city hotel with a restaurant, a bar, card terminals and an older lock system is the reference. Payments and locks come first; channels, accounting and POS follow.

Each phase has a named owner, a test result and a fallback.

  • Payments first
  • Locks second
  • Channels third
  • Accounting fourth
  • POS and telephony last

Before you commit

Name the model, the version, the owner and the fallback for every critical interface. A category is not a connection.

  • Exact model
  • Interface version
  • Named owner
  • Test result
  • Fallback procedure
Window grid on a hotel tower

The full guide

OTA, Payment and Lock Integration

The interfaces to scope, test and own before go-live.

Read the guide

Next step

See the platform on your own workflows.

A 30-minute walkthrough, built around your property type and the systems you already run. No slide deck — we work through arrivals, folios, night audit and reporting live.

Typical reply within one business day.