Skip to content
Lodgcore Hotel Management System

Hotel PMS Selection Scorecard — How to Score Vendors

Quick answer

A PMS scorecard turns a subjective demo into a comparable decision. Score the operating flows, interfaces, migration, support and total cost, with evidence for each. Weight the criteria before the demos, not after.

10–500+ rooms · 12 core modules · 300+ reports · 20+ integrations · 4–8 weeks

By Website technical team · Updated 4 November 2026

Hotel reception desk and lounge seating

Platform facts

The numbers behind the platform.

The platform runs 10–500+ room properties on 12 core modules, with 300+ report templates and 20+ integration points across 8 interface categories. Deployment comes in 3 models; a typical single-property implementation takes 4–8 weeks. Four product lines cover PMS, POS, membership and procurement; 5 property types are configured; the site is published in 10 languages with 6 knowledge hubs and 24 guides. One guest record and one ledger run the property, with 1 database, 1 folio and 1 audit trail. Reports are available in 2 languages; 4 role groups are supported; quotes reply within 1 business day. A quote has 3 room-count tiers, 5 preparation inputs and 3 implementation phases; cutover is planned in 3 phases. Use these figures to size the evaluation; the quote confirms rooms, modules, interfaces and deployment for your property.

Fact Figure
Property range 10–500+ rooms
Core modules 12
Report templates 300+
Integration points 20+
Integration categories 8
Deployment models 3 — cloud, on-premise, hybrid
Typical implementation 4–8 weeks
Product lines 4 — PMS, POS, membership, procurement
Property types 5
Site languages 10
Knowledge hubs 6
Published guides 24
Guest record 1
Ledger 1
Report languages 2 — English and Chinese
Quote response 1 business day
Role groups 4 — front office, housekeeping, F&B, finance

At a glance

A practical PMS scorecard

CriterionWeightEvidence to require
Core flows20%Arrival, group, room move, split folio
Housekeeping8%Board, tasks, inspection
Night audit8%Sequence, exceptions, sign-off
Reporting10%Daily pack, AR, drill-down
Interfaces12%Lock, payment, channel, accounting
Migration10%Method, reconciliation, cutover
Deployment6%Cloud, on-premise or hybrid
Support8%Hours, response, escalation
Total cost10%Three-year TCO with assumptions
Contract4%Data, exit, escalation
References2%Similar property, same interfaces
Roadmap2%Committed versus aspirational
Data ownership4%Export, deletion, residency
Security4%Access, recovery, evidence
Implementation team2%Named lead and experience

Why use a scorecard?

A demo is a performance. A scorecard forces every vendor to answer the same questions and gives the team a shared basis for the decision. It also documents why the chosen vendor won, which matters at renewal.

Which criteria should be scored?

The operating flows, the interfaces, the migration method, the support model and the total cost. Add security and data ownership because they are hard to change later.

Do not score the length of the feature list. A feature that is not native, not supported and not used is a cost.

How do you set the weights?

Set the weights before the demos, with the people who own the operation. A resort and a city hotel will weight packages and outlets differently; a group will weight consolidation and permissions differently.

How do you score each vendor?

Use a simple scale: 0 for absent, 1 for workaround, 2 for configuration, 3 for native. Ask for evidence: a screen, a test result, a reference. A score without evidence is an opinion.

What if the scores are close?

Look at the risk: migration, interfaces, support and exit. A tie on features is usually decided by the implementation method and the people, not by another demo.

When should you walk away?

When a must-have cannot be demonstrated, when the migration method is vague, when the contract has no exit, or when the support path is a generic inbox. A low price does not compensate for those.

Frequently asked questions

Frequently asked questions

Who should score?
The people who own the flows: front office, housekeeping, finance and IT. The project owner consolidates the scores.
How many vendors should we score?
Three is usually enough. More vendors add work without changing the shortlist.
Should price have the highest weight?
No. Price matters, but migration, interfaces and support decide whether the project succeeds. Weight the total cost, not the subscription.
How do we score a custom feature?
Score it lower than native and require an estimate, a test plan and an owner. A custom feature is a project, not a checkbox.
Can we change the weights later?
Only with a written reason. Changing weights after the demos is how a decision becomes political.
What is the most important criterion?
Fit for the operating flows and the migration method. The rest can be managed.
How do we document the decision?
Keep the scorecard, the evidence and the reference notes with the contract. It is useful at renewal and in a dispute.

Next step

See the platform on your own workflows.

A 30-minute walkthrough, built around your property type and the systems you already run. No slide deck — we work through arrivals, folios, night audit and reporting live.

Typical reply within one business day.